
Homore Discover
家居靈感, 順手儲起
滑卡睇風格, 傢俬同家居分享,收藏到自己 裝修專案。
- Inspiration · 好物 · 分享Save to project
Upload a PDF, a photo or pasted text and AI analyses your quote at once: every line checked against 20+ professional benchmarks, hidden charges, inflated prices and missing items flagged, and the questions for the firm drafted for you.
QuotationUpload a PDF, photo or pasted textHome typesHOS, public and private homesAnalyse now![]()
![]()
![]()
![]()
![]()
![]()
3,000+ Hong Kong ownershave checked quotes with Homore
Core feature · Renovation academy
What every line and symbol is for,one tap tells you;then walk into the 3D flat.A demo flat, for learning.




Quote checks, firm picks, progress and inspiration — no more digging across chats and albums.

Homore Discover
滑卡睇風格, 傢俬同家居分享,收藏到自己 裝修專案。

AI Quote Scan
Missing items, inflated prices and vague terms flagged line by line, with questions ready for the firm.

Firm matching
Thousands of real cases, estate photos and resident reviews — look before you ask.

Project tracking
No more messages scattered across chat rooms.

Inspiration board
A waterfall of Hong Kong estate photos and firm work — attach them when you enquire.
Four steps
From upload to a side-by-side report you can take to firms — four steps, under three minutes on average.
1A PDF, photos of the quote, or pasted text. Photos are read on your device; PDFs are stored privately.
2Checked against 20+ professional benchmarks: unit prices, payment stages, timeline, insurance, exclusions.
3Each item marked "stated / vague / not in quote" — gaps surface cell by cell.
4Two quotes side by side, with ready-made "may I ask" questions for the firm.
Quote traps
It is not you — quotes are genuinely hard to read. We unpack the three most common traps so you can spot them before signing.
Same job, three firms, three prices.
No shared scope or units — "lump sum" means whatever they like. A 450 sq ft flat: Firm A quotes $280K, Firm B $450K. The gap may not be profit — one may have left out debris and sockets.
Read the guide"That was not included" — after you sign.
Debris removal, waterproofing, common-area protection, socket counts — if it is not in the quote, it is not included. Extras arrive item by item on site: $5K here, $8K there — tens of thousands by handover is normal.
Read the guide"Equivalent grade" — a licence to swap materials.
"Equivalent emulsion paint" and "equivalent waterproofing" with no brand or model mean nothing. Both come in grades, and if the quote doesn't say, you get the cheapest one.
Read the guideTrap map
Every room has its usual gaps. Hover the list — or tap — to see what the quote should say.
Wherever you live
Works for HOS, public housing and private flats — and matches you with firms; one brief goes only to the ones you pick.

450 sq ft two-bedders: debris, waterproofing and socket counts are easiest to miss.

Housing Authority rules are strict — write out the scope of every change.

Full refurb prices vary most — align the scope before comparing.

Old flats reveal problems after demolition — cap the extras in writing.

Pipes, wiring and structure should be quoted as separate lines.

Exterior walls and roof waterproofing — put the warranty in the contract.

Check fittings, waterproofing height and cabinet boards item by item.

Even one corner deserves clear materials and timeline.
Try it free
Sign-in required, no forms. Pick a file and Homore checks every line against professional benchmarks, flagging gaps and vague terms. On the right: a real HOS quote, upload to report.

Owner stories
HOS, public housing, private flats — three homes, three traps found only after checking.
Asked first: +$8,000Two-bed HOS flat — the quote never stated waterproofing height. AI flagged it: I asked and added $8,000 up front instead of a blow-up at the end.
Mr ChanTuen Mun HOS owner · HOS renovation
A $60,000 gap uncoveredTwo quotes for my public flat were $60K apart — lining up the items showed one skipped debris. With so many rules, ready-made questions made asking easy.
Ms WongWong Tai Sin public tenant · public flat renovation
3 quotes compared line by lineFull gut renovation of an old private flat — three quotes, no idea how to compare. AI showed the cheapest had half the electrical points. I chose the clearest one.
Mr LeeTaikoo private owner · full renovationScenarios shown are illustrative; real user reviews live on each firm’s public profile.
FAQ
Comparing quotes, dodging hidden fees, how Homore AI works — the three most-asked questions.
Don't just compare totals. First, align the scope: which rooms, which trades, whether demolition and debris are included. Second, align units: per-sq-ft prices and “lump sum” items don't subtract directly. Third, align materials: “same-grade” paint vs a stated brand and model are different things. Fourth, align terms: timeline, number of payment stages, how extras are charged. When two totals differ, the gap may not be profit — one may simply omit debris haulage and point counts. Comparing quotes only counts when you itemise them on one checklist. For a faster pass, Homore's free AI quote check benchmarks it professionally and flags missing items and vague wording.
The eight commonest gaps: debris haulage (how mid- and end-stage runs are charged), common-area protection and insurance, gas connection, anti-moisture primer, joinery hardware and edging, sill stones supplied and fitted, overtime and drawing-change fees, remote delivery charges. Not written = not included — ask each item in writing before works start and keep the replies. E.g. a demolition line without debris noted, then haulage billed at completion, is an add-on. Homore's AI quote check scans for these omissions: anything not written is flagged “not listed” with a ready-made question you can paste to the firm for written confirmation.
Sign-in required: upload a quote PDF, photos of the quote, or paste the text. Quote photos are read on your device (OCR) and the photo itself is never uploaded; PDFs are stored privately in your account. The extracted text goes to AI analysis, checked against 20+ professional benchmarks: unit prices, payment stages and milestones, timeline, insurance, waterproofing, demolition and debris, and the exclusion list. Results are marked "stated / vague / not in quote", and each trap gets a ready-made "may I ask" question to send the firm. It does not judge whether a price is high or low and is not legal advice; results stay private and are never forwarded to any firm. Free; sign-in required.

Free; sign-in required. Your quote photos never leave your device.
Area guides
香港裝修攻略覆蓋18區:沙田, Tseung Kwan O, Kai Tak, Kowloon Bay, Kwun Tong, Tuen Mun, Tsuen Wan, Yuen Long, 大埔都有地區頁, HOS, Public rental, Private flat, 二手樓全屋翻新, 村屋同唐樓嘅開放式, 1-bed, 2-bed, 3房都啱用。瀏覽香港室內設計公司及裝修公司公開作品集同住戶評價, 上載報價單俾免費AI分析報價單內容, 捉漏項,再揀心水室內設計公司私人問價比較。
沙田裝修多數係沙田第一城, Sha Tin Centre, 馬鞍山呢類屋苑, 樓齡唔同, 水電同防水要求都唔同。沙田裝修開工前睇清管理處規則同施工時間,沙田裝修報價先比得公道。將軍澳, Kai Tak, Kowloon Bay, 觀塘及北區新盤與新入伙屋苑較多,新樓裝修重點係收樓驗樓, 一年保養期, 廚廁防水試水同訂造傢俬。
居屋裝修同公屋裝修限制唔同:未補地價居屋裝修改間隔同開放式廚房要跟房委會及屋宇署規定, 公屋裝修改動要先向房屋署申請。2026–27年新入伙及揀樓屋苑包括居屋啟盈苑, Kai Yeung Court, Yu Hing Court, Wui Hei Court, Yu Fung Court, Long Fung Court, Ying Fai Court, 綠置居盛緻苑, 宏緻苑,以及新公屋古雋邨, Fung Wong Leng Estate, 華富北邨。居屋裝修, 公屋裝修嘅2房裝修,最常見漏項係防水層高度, 泥頭清運同電位數量。
參考價:公屋, 居屋300–500呎全屋基本裝修約15–35萬, 2房裝修多數落喺中段;私樓400–700呎全屋翻新約30–60萬起。2房裝修預算要睇清拆唔拆晒同傢俬訂造呎數。以上屬規劃參考, 唔係報價保證,香港裝修實際價錢以合約為準。熱門屋苑:沙田第一城, Kingswood Villas, LOHAS Park, Taikoo Shing, Mei Foo Sun Chuen, Whampoa Garden, South Horizons, 愉景新城。