Quotes and comparison · Choosing
How to choose a renovation firm: check work sources, communication and scope—not only the lowest price
The right firm answers questions about your flat — not the one with the most finished photos.

In this article5 sections
When choosing a Hong Kong renovation firm, check work source labels, whether they can respond to your housing and work type, and whether communication is clear. Homore helps you save and request quotes — it does not guarantee works quality.
Read how the work is described before judging how good the photos look
Finished photos can show style, but alone they do not prove capability. Check whether an image is the firm’s job, owner-authorised, a concept, or a material demo. Homore requires honest source labels — unauthorised or unfinished images must not be sold as completed work. Clear source does not mean you must hire them; unclear source should not be your only basis for a decision.
Check that both housing and work type match your flat. A firm that mainly fits out shops may not suit a public-housing kitchen and bath; a team that mainly paints rooms should not be pushed into main contractor work by a vague “full renovation” enquiry. Put your housing and work types in the brief, then see if they will respond to that scope.
District, communication and how you can reach them are part of choosing too
If a firm states service areas, housing types, and works they take on, it is easier to judge whether to send a brief. Silence does not mean they cannot—but you should state district and limits when you request a quote. Whether the reply follows your items matters more than how polished it looks.
Homore firm pages keep work, introduction, reviews, and comments separate so one page is not stacked with promotion. You can move from work into the introduction or reviews without reading every field as a verified CV. Published reviews describe platform cooperation; work evidence is a separate check—do not read them as one promise of finished quality.
- Check the work’s source and housing type against your flat.
- See whether they answer with your rooms and constraints—not just package names.
- Listing, reviews, and work verification are separate marks—do not treat them as one.
A low price may only mean a smaller scope or unfinished items
The lowest total often comes from fewer included items, cheaper material assumptions, or excluding works only found on site. When choosing a firm, ask if they will mark included and excluded against your brief item by item. A firm that writes scope clearly is easier to keep talking with — even if their total is not the lowest.
Do not screen by “ask the cheapest one first”. You will spend time on mismatched scope. It is more effective to save a few firms whose works fit, then send the same brief.
Treat the team and the account as separate
On Homore, a regular account is for home briefs, saves and conversations; the company workspace is for work, enquiries and the team. Visiting a firm page does not make you a member, and saving a firm does not give it your brief. Choosing a firm is an explicit send — not a follow or a comment.
If someone asks you to leave the platform and send full address and budget by private message, judge the risk yourself. Homore keeps enquiries and chats so you can later check what was sent at the time.
Selecting a company is not completion, and not a contract
Selecting a firm on the platform only records that choice for follow-up chat. Scope, payment, warranty, programme, and who handles applications still need written confirmation. Homore does not guarantee works will start or results will follow just because you tapped select.
If a reply makes you uneasy, stop the conversation or use block and report. Choosing should leave you clearer—not push you faster into a vague package.
Key takeaways
- Align work source, housing type, and scope before looking at totals.
- See how they answer your constraints—not only marketing lines.
- Platform selection only records the choice. A works contract still needs separate confirmation.
FAQ
FAQ
Does being listed on Homore mean this firm is recommended?
No. Being listed means the firm passed the checks needed to appear on the platform. It does not guarantee a fit for your flat, work quality, or cost.
Should a high rating mean you choose them?
Reviews add others’ experience, but samples can be small, and enquiry reviews are not verified completion. Still cross-check work sources and your own brief.
Can I ask several firms at once?
Yes. Send the same brief explicitly to the firms you choose. Each firm only sees its own enquiry — not rivals’ quotes.
Next
Save matching works first, then send the same brief
You choose firms so scope gets clear answers. Starting from works and your brief gets closer to the flat you will live in than starting from the lowest price.