Skip to content
Renovation guides
Renovation guides

Renovation journalSeptember 2026

Housing type · Public housing

What to watch for in Hong Kong public housing renovation: know the limits before deciding what to change

What goes wrong most in public-housing renovation is not style—it is starting demolition before checking what you may change.

A small Hong Kong flat in natural light, with a home floorplan model on a wooden table.
Start the brief from how spaces relate. Original home illustration.
In this article5 sections

For public-housing renovation, check what you may change, pipework, AC positions, and neighbour impact first, then build one brief you can send to several firms. Homore helps you state the need clearly—not chase a total first.

Separate “want to change” from “allowed to change” first

When renovating a Hong Kong public-housing flat, many people start with cabinet styles, floor colour or sofa placement. Those matter, but they should not be the first decision. Walls, drainage, electrics and windows in public housing often have clearer use boundaries than private flats. If you demolish like a private full renovation before checking what you may change, you can end up restoring work, paying more, or arguing with neighbours and the management office.

A safer approach is three columns first: must keep (e.g. existing drain position, immovable structure), want to improve (e.g. kitchen storage, lighting, base-cabinet height), and negotiable (e.g. keep some old cabinets, do it in stages). These are not a contract—they help you state expectations before requesting a quote. Homore’s home brief is built for this: housing type and works type are separate, and public housing does not block you from organising your brief.

Checking the flat’s condition is more useful than collecting three totals first

Before requesting a quote, note the flat as it is: approximate saleable area, how many bedrooms and living rooms, open or enclosed kitchen, bathroom windows, existing AC positions, signs of leaks, and whether the floor clearly slopes. You do not need to be a contractor — take current photos and mark which walls or cabinets you want to change. Firms see the same information, so comparison means something.

Common public-housing limits include moving water and drainage points, altering windows, fixing into places that must not be drilled, and works that affect downstairs or corridors. Actual rules follow the Housing Authority, estate office, and guidelines for your flat—this article will not replace official documents with one Hong Kong-wide allowed/not-allowed list. Put known limits in your brief so firms know whether the quote covers applications, protection, reinstatement, or alternatives.

  • Note saleable area, room count, whether kitchen and bath have windows, and existing AC positions.
  • Photograph leaks, mould, hollow floors or warped old cabinets — not only a pretty living-room shot.
  • Note known management-office or estate limits with dates — avoid oral rumour.

Works order: wet areas, protection and noise matter more than “strip everything at once”

Many public-housing flats struggle most in kitchen and bath: not enough storage, slow drainage, dim light, mould under cabinets. These are interior improvements and usually easier to scope than “open up the whole flat”. Decide wet-area waterproofing and base cabinets first, then living-room floors and paint. New living-room flooring before kitchen and bath demolition often gets dirtied or damaged.

Public-housing corridors are narrow, neighbours close, and goods lifts have time slots. Say in your brief whether daytime works are allowed, whether elderly residents live with you, and whether weekend staging is needed, so firms can judge protection, material delivery, and debris clearance. These are not side notes—they affect price and whether you can live with the programme.

When requesting a quote, do not only ask “how much for a full public-housing renovation?”

“How much does public-housing renovation cost?” has no single answer—the scope may mean new cabinets, a full kitchen and bathroom redo, whole-flat paint and flooring, or only fixing a leak. Send the same vague line to three firms and the three figures rarely cover the same work. Comparing totals without comparing inclusions only makes the vaguest quote look cheapest.

Safer still: one brief, one set of photos, one list of must-haves, then replies from the firms you explicitly choose. Homore saves your brief first; you pick firms and send deliberately. Each firm sees only what it received—not rivals’ quotes. Replies, quote summaries and chat stay in that enquiry so you can check item by item, instead of losing track across messaging apps.

Being listed and official approval are two different things

Work shown by companies on Homore must be honestly labelled by its source — concept renders or unauthorised photos must not be presented as completed works. Listings and reviews are moderated, but listing does not equal Housing Department approval, a guarantee of workmanship, or that the firm suits your estate. Enquiry reviews describe the platform experience, not verified completion.

If you have not picked a firm yet, browse inspiration, save photos and portfolios, then write "public housing, partial works, kitchen first" into your brief. The goal is not a perfect brief in one go — it is that the next firm you share with does not have to guess what kind of flat you live in or which areas you want to touch.

Key takeaways

  1. For public-housing renovation, check what you may change and the present condition before style and totals.
  2. Only the same brief and photos are worth comparing. “How much for a full renovation?” is not a specification.
  3. Platform listing, a firm’s reply and official approval are three different things — do not treat them as the same.

FAQ

FAQ

Is renovation not allowed in public housing?

No. Many residents upgrade cabinets, lighting, paint, or wet areas in part—but what you may change, applications, and protection rules follow the applicable guidelines and management office. Write the locations you want to change, then ask which approaches are workable.

Will Homore apply to the Housing Authority for me?

No. Homore helps you organise your needs, save photos and portfolios, and enquire privately with the firms you choose. Applications, work permits and contracts remain between you, the authorities and your chosen firm.

I do not have a floor plan yet. Can I still start a brief?

Yes. Start with rooms, pain points and what must stay, plus current photos. Floor plans help, but they are not required to begin a brief.

Next

Write what you may change first, then decide which firms to ask

Use a home brief to note your public-housing flat’s condition and what you want improved, then choose firms and send. You can edit the brief anytime; for sent enquiries, send an update so the other side sees changes.

Back to the top of the article

Homore Renovation journal

Compiled by the Homore editorial team to help you read the details before you ask for quotes or sign.

This is editorial guidance on Hong Kong home renovation — not a works quote, legal advice, or Housing Authority / Buildings Department approval. Actual limits follow the relevant departments, the deed of mutual covenant, and written confirmation from the firm you select.

Editor images illustrate the article topic; they are not proof of a company’s completed works.

Methodology · Open datasets · About Homore