Skip to content
Renovation guides
Renovation guides

Renovation journalSeptember 2026

Quotes and comparison · Process

How to request a Hong Kong renovation quote: one brief, ask the firms you choose

Requesting a quote is not a race for the fastest reply. It is getting a few firms to answer the same clear question.

Floor plan, notebook, pencil and material samples on a home wooden table.
A clear brief is the starting point for requesting a quote; original editorial illustration.
In this article5 sections

For Hong Kong renovation quotes, organise one brief first, then send to firms you explicitly choose. Compare inclusions—not just one total. Homore keeps the request, replies and conversation in the same enquiry.

Have a reusable brief first, then decide whom to ask

The most common Hong Kong quote-request mess is telling different versions in different chats: full kitchen redo to one firm, door swap only to another; floor plans to one, living-room photos to another. Three numbers then cannot be compared—not because the market is mysterious, but because the questions differed.

A safer order: save your own brief first—housing type, works type, rooms, budget direction, current condition and reference images. Then choose firms and press send deliberately. Homore treats this brief as reusable, not a one-off message that vanishes. If you change it, send an update on the enquiry so the other side sees the latest version.

An explicit send is safer than dropping details into a public comment

A renovation brief includes address clues, household details and budget—it should not become public. Homore quote requests are sent privately to firms you choose; each firm sees only its own enquiry, not rivals’ names or quotes. Retrying the same send should not create duplicate enquiries.

The enquiry code only identifies that invitation. It cannot be used to log in or view someone else’s conversation. It is an identifier, not a key. Saving a firm or work is not requesting a quote; favourites do not send your brief automatically.

  • Send the same brief to the firms you choose — not a different verbal scope to each.
  • Unsent drafts stay in your account only. Firms cannot see them.
  • Sent content is fixed to that snapshot. Later changes need an explicit update.

Ask what is included — not only the total

“Can whole-flat renovation stay within $400,000?” only gets vague answers. Better questions: is demolition and haulage included, will waterproofing be redone, are sanitary fittings a named brand, who handles protection and clearance, and which items need an on-site check. Put these in your brief’s notes and ask for item-by-item answers.

Firms may reply in text, ask for more detail, or submit a quote summary. Homore keeps these on that enquiry so you can open Compare later. Early replies, rough budgets, and quote summaries are not works contracts and do not guarantee final cost.

Asking a few at once is clearer than asking only the most visible one

Asking one firm gives you no comparison. Asking too many leaves no time to check each reply. A practical approach is to narrow by work and service areas, then send the same brief to a few firms. Homore limits how many firms you can send in one batch so you actually read the replies — not blast quote requests.

When choosing, check whether work sources are clear, whether the firm states which housing and work types it does, and whether you accept how they communicate. Do not select on lowest total alone. Listed firms still need your own judgement for this flat.

After you request a quote, you still decide the next step

A firm may reply interested, ask for more information, or decline. You can also withdraw the enquiry. These statuses help you manage the conversation—they do not mean works have started. Appointments need both sides to confirm; you still check quote items yourself.

If you are not ready to ask for quotes, start from inspiration and company portfolios — or leave the brief half-finished. Blank fields are better than made-up answers. Homore does not block saving just because you have not filled every professional field.

Key takeaways

  1. Before requesting a quote, prepare a reusable, updatable brief, then choose firms to send it to.
  2. Compare inclusions, exclusions and site-confirmation items—not just the totals.
  3. Saving, requesting a quote, replies and contracts are different steps — do not treat one as finishing another.

FAQ

FAQ

If I save a firm, will they automatically receive my renovation brief?

No. Saves stay in your account. Only when you explicitly choose a firm and send an enquiry will they see that brief.

Can I request a quote first and fill in the brief later?

You can send what you already know and mark what is still unknown. If scope changes later, update explicitly so firms do not price or build from an old snapshot.

Will Homore pick the cheapest firm for me?

No. The platform does not compare for you, and does not guarantee the lowest price or the best works. You see replies from firms you chose, on the same brief.

Next

Save the brief first, then decide which firms to ask this time

Put housing, works, rooms and as-is notes in the home brief, then send explicitly to firms you choose. Only the same question is worth comparing answers for.

Back to the top of the article

Homore Renovation journal

Compiled by the Homore editorial team to help you read the details before you ask for quotes or sign.

This is editorial guidance on Hong Kong home renovation — not a works quote, legal advice, or Housing Authority / Buildings Department approval. Actual limits follow the relevant departments, the deed of mutual covenant, and written confirmation from the firm you select.

Editor images illustrate the article topic; they are not proof of a company’s completed works.

Methodology · Open datasets · About Homore