Housing type · Private flat
Private flat full refresh: decide housing type and works scope separately
Whole-flat renovation risk usually comes from scope written too wide and sequencing too fast—not from which style you picked.

In this article5 sections
A private flat full refresh is not finished by emptying the unit. Separate housing type from works scope; spell out demolition, M&E, wet trades and finishes; then let different firms reply to the same brief.
More change is possible in a private flat—that does not mean change everything at once
Private flats often allow more leeway on walls, kitchen/bath layout and electrical load than public housing—but “can change” and “worth changing this time” are still different. Opening a kitchen, moving a bath, changing windows or raising air-con load all touch waterproofing, drainage, structural judgment and neighbours. If a full refresh only says “strip everything and redo”, each firm will invent its own “everything”.
Homore keeps housing type and work type separate: in a private flat you can still choose partial works; a full refurbishment is not assumed to be a new public-housing flat. Pick the work type first, then list the rooms to change—more useful than a vague “luxury whole flat” label.
Describe scope by rooms and trades, not style words alone
“Japanese”, “modern”, and “wood-tone” help you find images on Inspiration, but they do not replace scope. Firms need to know which walls come down, which cabinets stay, whether the floor will be raised, whether appliances are already bought, whether lighting points need rewiring, and whether all doors will be replaced. Style words belong in references; trades and rooms are the backbone of a quote.
A clearer whole-flat brief usually goes room by room—living room, bedroom, kitchen, bathroom, maid’s room or entresol—and marks each as redo, maintain, or leave alone. That way you avoid a living-room quote for new flooring when you meant to keep the old timber.
- List each room: redo, partial repair, or leave alone.
- Note known large appliances, air-con and ordered materials so quotes do not double-count or miss connections.
- Treat inspiration images as direction — not as construction drawings.
Order stays wet areas, hidden works, then visible finishes
Whole-flat renovation is easy to get swept away by finish photos, but cost and time mostly go to demolition, drainage, waterproofing, electrics, wet trades, and protection. Paint and furniture can wait; changing hidden works after they are done costs far more. Writing the look you want in the brief is fine—when you request a quote, ask the firm to state what hidden works include.
If people still live in the flat, a one-go whole-home job may not work. Say whether you can move out temporarily and which rooms must finish first so the firm can plan phased protection. Phasing is not a weaker plan — it is an honest split of scope.
Building rules, neighbours and material delivery are part of private-flat work too
Private buildings still have management offices, lift bookings, works hours and debris rules. These affect cost and whether you can live with the works. Put known building rules in your brief—better than discovering weekend-only works later.
Changes that may affect structure, external walls or common areas need a qualified person’s judgment. Homore does not replace that judgment in articles or the product, and listing a company does not mean any statutory approval.
Whole-flat renovation needs the same brief and repeated checks even more
The larger the scope, the less you should rely on one total. Ask replies to split demolition/haulage, M&E, wet trades, carpentry, painting and sanitaryware, and note which materials are provisional brands. On Homore you compare firms’ replies and quote summaries to the same brief—not a platform-guaranteed finished price.
Selecting a company on the platform only records your choice—it is not a works contract. Scope, payment, warranty and programme still need written confirmation with the firm. The brief gives that contract a shared starting point.
Key takeaways
- For a private flat full refresh, list rooms and trades first; style words are reference only.
- Hidden works and wet areas should be clear before visible finishes.
- Platform comparison helps you align replies, but it does not replace a works contract.
FAQ
FAQ
Are private flats always better suited to a full refresh than public housing?
Private flats often allow more change, but older buildings’ pipes, drainage and electrics can be more complex. Whether to do a full refresh still depends on move-in timing, budget and must-haves—not housing type alone.
Can I renovate only the living room and leave other rooms alone?
Yes. Housing type and work type are separate on Homore. For partial work, list rooms you will not touch so firms do not price unrequested scope into the same quote.
Can inspiration images be used as works scope?
No. Inspiration images help show direction, but sizes, structure, drainage, and materials must be checked against your flat. Add the images to your brief with notes such as “colour / storage reference only”.
Next
Break the whole home into checkable rooms, then send quote requests
In your Home brief, mark each room as redo or keep before choosing firms. Totals only become comparable once scope is aligned.